We worked for NSD on behalf of ISG construction on this project for a new Asda store in Woking.
We were asked to install 4515m² concrete flooring on the sales floor with an Powerfloat finish as well as 1336m² concrete flooring back of the house.
Dry shake topping was applied to the back of house flooring to increase the strength of the slab surface.
Komentáře