Project Specification
Concrete Pour Size 1,030 ㎡
Tolerance achieved SR3
Concrete Laid per day 105 ㎥
Our team installed ground floor concrete slabs at Bowfell House, Urmston, a Care Home with 40-beds capacity, another project for our repeat Client James Callaghan Sons & Co with a total area of 1,030 m².
We laid concrete to SR3 with a skip float finish,
We laid underfloor insulation and perimeter insulation as well
“CBS Concreting installed ground floor concrete slabs with a skip float finish for the refurbished Bowfell House, the project was delivered ahead of schedule"