Project Specification
Concrete Pour Size 22,719 ㎡
Tolerance achieved SR3
Concrete Laid per day 134 ㎥
Our team are installing raised concrete floors for our client Domis Property Group.
At this project, a 9 storeys development, we’re laying concrete slabs on metal decking with a skip float finish.
Also, we’re laying steel fabric to concrete slabs over the entire project.
Total job size 22,719 m².
“CBS are installing raised concrete slabs for Burlington Square new development, a 273 apartment, 9 storey building"
Project Summary