Burlington Square, Manchester


Project Specification

Concrete Pour Size 22,719 ㎡

Tolerance achieved SR3

Concrete Laid per day 134 ㎥


Our team are installing raised concrete floors for our client Domis Property Group.


At this project, a 9 storeys development, we’re laying concrete slabs on metal decking with a skip float finish.


Also, we’re laying steel fabric to concrete slabs over the entire project.


Total job size 22,719 m².


“CBS are installing raised concrete slabs for Burlington Square new development, a 273 apartment, 9 storey building"

Project Summary