Project Specification
Concrete Pour Size 1,720 ㎡
Tolerance achieved SR3
Concrete Laid per day 121 ㎥
Our team installed internal concrete floors for our repeat client ACS Construction at AstraZeneca Packing Hall.
At this project we completed 2 slabs, a ground floor slab and a raised concrete slab on metal decking.
Total job size 4,226 m²
“CBS installed concrete slabs for the ground & upper floors for our AstraZeneca Packing Hall project, a project with a total area of 4,200 ㎡"